Startup Test Requirements

This document specifies requirements for the startup test sequence that provides visual feedback to users during system initialization, demonstrating hardware functionality and successful boot.

Document Version: 2.0 Last Updated: 2025-11-12

Overview

The startup test sequence provides immediate visual feedback during system boot, demonstrating that the device is initializing properly and all LEDs in the strip are functional.

Functional Requirements

Requirement: LED Controller Initialization REQ_STARTUP_1
status: approved
tags: startup, initialization, led
priority: mandatory

Description: The system SHALL initialize the LED controller during startup before performing the visual test sequence.

Rationale: LED hardware must be ready before the startup sequence can execute.

Acceptance Criteria:

  • AC-1: LED controller SHALL be initialized successfully during startup

  • AC-2: System SHALL proceed to visual sequence only after successful LED initialization

Verification: Verify LED controller initializes without errors during system startup.

Requirement: Visual Boot Sequence REQ_STARTUP_2
status: approved
tags: startup, ux, validation
priority: mandatory

Description: The system SHALL display a visual boot sequence by lighting LEDs in sequential order from first to last, providing clear indication that the system is initializing and all LEDs are functional.

Rationale: Gives users immediate visual feedback that the device is booting properly and demonstrates that all LEDs in the strip are working correctly.

Acceptance Criteria:

  • AC-1: LEDs SHALL light sequentially from position 0 to position (led_count-1)

  • AC-2: Each LED SHALL display a distinct color during the sequence (e.g., blue or white)

  • AC-3: Test SHALL complete within reasonable time limits (example: 40 LEDs @ 50ms each = 2.0 second maximum)

  • AC-4: Each LED SHALL turn off before the next LED activates (single moving light pattern)

  • AC-5: Normal distance measurement SHALL begin after sequence completes

Verification: Observe startup sequence, verify all LEDs activate in order with appropriate timing and visual clarity.

Non-Functional Requirements

Requirement: Timing Performance REQ_STARTUP_3
status: approved
tags: startup, performance, timing
priority: important

Description: The startup test sequence SHALL complete within reasonable time limits to avoid significantly delaying normal system operation.

Rationale: Users expect reasonable boot times; startup test should provide value without excessive delay.

Acceptance Criteria:

  • AC-1: Complete startup sequence SHALL finish within 5 seconds for 60 LEDs

  • AC-2: LED activation timing SHALL be configurable (default 50ms per LED)

  • AC-3: Total startup delay SHALL not exceed 10 seconds regardless of LED count

Verification: Measure startup sequence timing with different LED counts, verify performance meets timing requirements.